Contact and place of performance
Carlos Diaz Garcia
Curtis Bay, MD 21226
USA
Cost of shipping and packaging must be added to the price of the Item NSN: 3120-10-621-2293 PART #: 01-573-06-17 NOMENCLATURE: Bearing Sleeve QTY: 10 U/I: EA CONSTRUCT ACCORDING TO USCG DRAWING FL-7101-573 PIECE NUMBER 17 AND ATTACHED STATEMENT OF WORK. SECTION 5 PACKAGING & MARKING OF STATEMENT OF WORK - ADDITIONAL INSTRUCTIONS; PACKAGING, MARKINGS & BARCODING INSTRUCTIONS SHALL READ; INDIVIDUALLY PACKAGED I...
View moreOTHERS, ARE ACCEPTABLE. PLACED INSIDE OF BAG SHALL BE DESICCANT IN ACCORDANCE WITH
TYPE II OR III OF MIL-D-3464.
MARKING IAW MIL-STD-129R & BAR CODING IAW ISO/IEC-16388-2007, CODE 39 SYMBOLOGY.
PACKAGE LABEL:
ITEM NAME:
PART NUMBER:
NSN:
QNTY: (EXAMPLE 1 EA)
COND-A
CONTRACT NUMBER / ORDER NUMBER
POC: BRADY MYERS
EQUIPMENT SPECIALIST
E-MAIL: [email protected]
PH: 571-613-3388
Please see Attachments
Drawings Available Upon Request
The United States Coast Guard Surface Forces Logistics Center (SFLC) Procurement Branch 2 has issued solicitation 70Z08526Q40176B00 for the acquisition of ten sleeve bearings. These items, identified by NSN 3120-10-621-2293 and Part Number 01-573-06-17, must be manufactured in accordance with USCG Drawing FL-7101-573, piece number 17, and the provided statement of work. This federal opportunity is designated as a Small Business Administration (SBA) set-aside under NAICS 3120: BEARINGS, PLAIN, UNMOUNTED and PSC 332991: Ball and Roller Bearing Manufacturing.
The procurement includes specific requirements for packaging, marking, and shipping to Curtis Bay, Maryland. Each bearing must be individually packaged following MIL-STD-2073-IE Method 10 using weather-resistant paperboard, waterproof barriers, and bubble-wrap cushioning as needed within double-wall fiberboard boxes. Technical specifications require the use of desiccant inside bags and marking according to MIL-STD-129R and ISO/IEC-16388-2007. Detailed package labeling must include the item name, part number, NSN, quantity, and contract number.
Responses for this solicitation are due by June 10, 2026. The contract documentation includes two attachments: the primary solicitation document and a list of applicable FAR clauses. Carlos Diaz Garcia serves as the primary point of contact for this requirement, and technical drawings are available upon request. All pricing must incorporate the costs associated with packaging and shipping.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.