Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Apr 28, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Apr 28, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Apr 28, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W9128F26RA076¬iceType=SolicitationNotice | LINK | Apr 28, 2026 |
Bradley Field Tank Repairs
Contact and place of performance
Jaylem Durousseau
Windsor Locks, CT 06096
USA
NOTE: Proposal due date has been extended to June 22ns at 1400 CDT to allow for review of Projnet answers to be released and reviewed.
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
This project includes repairs and maintenance of Facility 10418 (Tank 2), a vertical aboveground storage tank, and its associated containment area at Bradley Field in Connecticut..
The Department of the Army, via the W071 ENDIST Omaha office, is soliciting proposals for repairs and maintenance at Bradley Field in Windsor Locks, Connecticut. This project focuses on Facility 10418 (Tank 2), a vertical aboveground storage tank, along with its associated containment area. The requirement is classified under NAICS 237120, Oil and Gas Pipeline and Related Structures Construction, and PSC Y1GC, Construction of Fuel Storage Buildings.
This solicitation is designated as a Service-Disabled Veteran-Owned Small Business Concern (SDVOSBC) set-aside. Interested parties must submit their proposals by the deadline of June 22, 2026, at 1400 CDT, a date extended to facilitate the review of information released through Projnet. One PDF attachment was published with the initial notice on April 28, 2026.
The primary point of contact for solicitation number W9128F26RA076 is Jaylem Durousseau. The project scope encompasses all necessary activities to restore and maintain the specified fuel storage infrastructure at the Connecticut site. This notice was last updated on June 2, 2026, to reflect the revised response schedule and technical review period.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.