Name | Type | Posted | Actions |
|---|---|---|---|
Modular Pharmacy Cleanroom - Combined Synopsis Solicitation Commercial Services.pdf | Apr 15, 2026 |
MODULAR MOBILE PHARMACY COMPOUNDING CLEANROOM
Contact and place of performance
JAMES E. BOLES JR
Decatur, GA 30033
USA
The Atlanta VA Healthcare System with a modular mobile pharmacy cleanroom lease that is compliant with current USP 797 and USP 800 standards until construction is complete on the current cleanroom. The Atlanta VA Health Care System Pharmacy Service compounds numerous medications daily so a temporary USP 797 and USP 800 cleanroom is required to avoid any interruption to patient care services. The objective of th...
View moreSalient Characteristics:
Period of Performance Base Year plus (1) One Option Year.
The Department of Veterans Affairs requires the lease and installation of a modular mobile pharmacy compounding cleanroom for the Atlanta VA Healthcare System in Decatur, Georgia. This requirement is issued as a combined synopsis/solicitation under solicitation number 36C24726Q0458 and is set aside for SDVOSBC (Service-Disabled Veteran-Owned Small Business Concern). The procurement is classified under NAICS 532120 for Truck, Utility Trailer, and RV (Recreational Vehicle) Rental and Leasing and PSC W023 for LEASE OR RENTAL OF EQUIPMENT- GROUND EFFECT VEHICLES, MOTOR VEHICLES, TRAILERS, AND CYCLES. Responses are due by April 23, 2026.
The purpose of this contract is to provide a temporary facility compliant with USP 797 and USP 800 standards to prevent interruptions in patient care during the construction of a permanent cleanroom. The scope of work includes the delivery, installation, testing, and decommissioning of a 14-foot by 48-foot modular building equipped with sterile buffer rooms, laminar air flow hoods, biosafety cabinets, and a hazardous exhaust system. The contractor is responsible for all labor, materials, and equipment, including the installation of a covered walkway with a ramp and the integration of a remote monitoring and security system. The performance period consists of one base year and one option year.
One attachment, a combined synopsis/solicitation document in PDF format, was included with the notice published on April 15, 2026. The contract requires the modular unit to be elevated and leveled to the height of the facility loading dock and includes pre-certification activities such as smoke testing for all air filtration and safety cabinets. The primary point of contact for this requirement is James E. Boles Jr.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.