Name | Type | Posted | Actions |
|---|---|---|---|
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Jul 2, 2025 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W15QKN25QA180¬iceType=SolicitationNotice | LINK | Jul 2, 2025 | |
https://dodprocurementtoolbox.com/ | LINK | Jul 2, 2025 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Jul 2, 2025 |
OMS Mini-Splits
Contact and place of performance
Jonathan Krakower
Not specified
On behalf of the 99th Readiness Division, the Army Contracting Command has a construction project, CSS# 98478 OMS Mini-Splits. This project involves the removal of three existing through-the-wall mounted air conditioning units and the installation of energy-efficient, ductless mini-split heat pump systems at two Army Reserve facilities.
The Army Contracting Command – New Jersey (ACC-PICA), acting on behalf of the 99th Readiness Division, is soliciting a construction project identified as CSS# 98478 OMS Mini-Splits. The scope of work requires the removal of three existing through-the-wall mounted air conditioning units and the subsequent installation of energy-efficient, ductless mini-split heat pump systems. These services will be performed at two designated Army Reserve facilities.
This solicitation is issued under solicitation number W15QKN25QA180 and is categorized under NAICS code 238220, Plumbing, Heating, and Air-Conditioning Contractors, and PSC Z2EZ, Repair or Alteration of Other Industrial Buildings. The opportunity is designated as a Small Business Administration (SBA) set-aside. Interested parties must submit their responses by the deadline of July 31, 2025. Jonathan Krakower serves as the primary point of contact for this requirement.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.