Name | Type | Posted | Actions |
|---|---|---|---|
Q_A-26B0006-Repair Base Switching Station (PM).pdf | May 13, 2026 | ||
Attendance Record-FA489726B0006_5 May 2026_1000.pdf | May 6, 2026 | ||
14. Provisions and Clauses.pdf | Apr 28, 2026 | ||
COMBO_RFTP-FA489726B0006-Repair Base Switching Station (Amendment 1).pdf | Apr 27, 2026 | ||
10. Level 1 Executive Summary Project Schedule.pdf | Apr 21, 2026 | ||
9. Mountain Home Air Force Base Installation Facility Standards (5 September 2018).pdf | Apr 21, 2026 | ||
8. PCB Sampling and Analysis-Bldg 1406 (per USC §761.61).pdf | Apr 21, 2026 | ||
7. SOP for Sampling Porous Surfaces for PCBs (May 2011).pdf | Apr 21, 2026 | ||
6. DIAGRAM-Bldg 1406 and 1017-Switching Station.pdf | Apr 21, 2026 | ||
5. MHAFB Switching Station One-Line-Diagram (21 January 2026).pdf | Apr 21, 2026 | ||
4. SPECIFICATIONS-Bldg 1406 and 1017-Switching Station.pdf | Apr 21, 2026 | ||
3. DESIGN ANALYSIS-Base Switching Station-Bldg 1406 and Bldg 1017 (Pgs 501-1104).pdf | Apr 21, 2026 | ||
3. DESIGN ANALYSIS-Base Switching Station-Bldg 1406 and Bldg 1017 (Pgs 1-500).pdf | Apr 21, 2026 | ||
2. DESIGN DRAWINGS-Repair Base Switching Station (HDR 21 October 2025).pdf | Apr 21, 2026 | ||
1. SOW - Repair Base Switching Station, Bldg 1406 & Bldg 1017 - 26Mar2026.pdf | Apr 21, 2026 | ||
COMBO_RFTP-FA489726B0006-Repair Base Switching Station.pdf | Apr 21, 2026 | ||
14. Provisions and Clauses.pdf | Apr 21, 2026 | ||
13. REA Definitization Information.pdf | Apr 21, 2026 | ||
12. Real ID Act FAQ (Base Access).pdf | Apr 21, 2026 | ||
11. 366 SFS FORM 30-Base Installation Access Form.pdf | Apr 21, 2026 |
Repair Base Switching Station
Contact and place of performance
Ryan Rubenstein
Mountain Home AFB, ID 83648
USA
The Technical Proposal due date has been extended to 26 May 2026 due to the 25 May 2026 falling on a Federal holiday. Questions and Answers have been posted and are currect as of 5/13/2026 The Follow dates have been updated: Site Visit: 5 May 2026 Questions: 12 May 2026 Technical Proposals Due: 26 May 2026 Mountain Home Air Force Base (MHAFB) has a requirement to (1) construct a new, complete, and operati...
View moreSolicitation number FA489726B0006 request for proposal (RFP) for the Repair Base Switching Station requirement as part of the Two-Step Sealed Bidding process.
This acquisition is set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.
See attachment 1, RFTP for a list of Line Item Numbers.
See attachment 14 for a list of Clauses and Provisions applicable to this requirement.
The Department of the Air Force, specifically the 366 CONS PKP at Mountain Home Air Force Base (MHAFB), Idaho, has issued solicitation FA489726B0006 for the repair and construction of a base switching station. This project involves constructing a new, complete, and operational electrical switching station designated as Building B1017, transitioning base loads from the existing switching station at Building 1406 to the new facility, and demolishing the old structure. The scope includes site work, foundations, structural steel, installation of medium-voltage electrical equipment (12.47kV), control building construction, power ductbanks and conduits, and final commissioning to enhance electrical infrastructure reliability.
This requirement is a combined synopsis/solicitation for commercial products or services following a Two-Step Sealed Bidding process. The acquisition is restricted through an SBA Small Business Administration (SBA) set-aside. The project is classified under NAICS 237130, Power and Communication Line and Related Structures Construction, and PSC Z2MZ, Repair or Alteration of EPG Facilities - Other, Including Transmission. Technical proposals are due by May 26, 2026, while the final response deadline is May 29, 2026.
Performance is located at Mountain Home Air Force Base under the management of point of contact Ryan Rubenstein. The solicitation includes 20 attachments, such as the Request for Technical Proposal (RFTP), an executive summary project schedule, installation facility standards, and a questions and answers document current as of May 13, 2026. The contract incorporates various federal provisions and clauses by reference, including a list of line item numbers provided in the solicitation attachments.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.