Name | Type | Posted | Actions |
|---|---|---|---|
2031ZA26Q00100 Elevator Modernization Solicitation.pdf | Jun 10, 2026 | ||
Attachment 1 - Site Visit Information.pdf | Jun 10, 2026 | ||
Attachment 2 - Elevator Modernization - SOW.pdf | Jun 10, 2026 | ||
Attachments 2a - 75D-07.0-04 EHS Contractor Requirements.pdf | Jun 10, 2026 | ||
Attachment 2c - 75B-07.0-06 EHS Requirements for Large Equipment Purchases.pdf | Jun 10, 2026 | ||
Attachments 2b - 75B-07.0-05 EHS Requirements for Purchased Materials.pdf | Jun 10, 2026 | ||
Attachment 2d - 75D-07.0-07 Restricted Materials at DCF.pdf | Jun 10, 2026 | ||
Attachment 2f - 2024 Elevator Assessment - REDACTED_Redacted.pdf | Jun 10, 2026 | ||
Attachment 3 - Pricing Schedule.xlsx | XLSX | Jun 10, 2026 | |
Attachment 4 - DCF Wage Determination.pdf | Jun 10, 2026 |
Elevator Modernization
Contact and place of performance
Marico Sellers
Washington, DC 20228
USA
The Contractor shall develop bridging documents, consisting of conceptual design, technical specifications, and performance criteria for the complete repair of seventeen electric elevators (12 passenger and 5 freight as identified in the 2024 Elevator Assessment) replacing all components that are obsolete and/or have reached end-of-life, including MEP systems upgrades, ACM abatement, PCBs removal, structural and...
View moreThe Bureau of Engraving and Printing, Office of the Chief Procurement Officer, is seeking engineering services for the modernization of 17 electric elevators at its Washington, DC, location. Under solicitation 2031ZA26Q00100, the contractor will develop bridging documents, including conceptual designs, technical specifications, and performance criteria, to facilitate a future design-build construction contract. The scope covers the complete repair of 12 passenger and five freight elevators, requiring the replacement of obsolete components, mechanical, electrical, and plumbing (MEP) system upgrades, and structural alterations to bring machine rooms and hoistways into code compliance. The project also involves asbestos-containing material (ACM) abatement, the removal of polychlorinated biphenyls (PCBs), and the integration of new elevator controllers with the agency’s existing Supervisory Control and Data Acquisition (SCADA) system.
The selected contractor must ensure all designs comply with federal, state, and local regulations while minimizing disruptions to building operations and meeting specific energy savings and sustainability goals. This requirement is classified under NAICS 541330 Engineering Services and PSC C215 ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING. This solicitation is designated as a SBA Small Business Administration set-aside.
Responses are due by July 21, 2026, and should be directed to Marico Sellers. The solicitation package includes 10 attachments, such as the statement of work, site visit information, and various environmental health and safety requirement documents for materials and equipment.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.