Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Apr 16, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Apr 16, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Apr 16, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W911S226U3039¬iceType=CombinedSynopsisSolicitation | LINK | Apr 16, 2026 |
ZERO TURN LAWN MOWER 52 INCH
Contact and place of performance
Carrie Lawton
13602
This machine is equipped with a minimum 27-horsepower, 2-cylinder gasoline engine that features electronic fuel injection, eliminating the need for a choke, and includes a replaceable engine oil filter. It comes with a 52-inch fabricated mowing deck, ROPS bar protection, and greaseable spindles. The unit has a hydrostatic transmission with a cooling fan and a hand-operated parking brake.The mower is designed with fro...
View moreThe Department of the Army, specifically the MICC-FT Drum, has issued a combined synopsis and solicitation under solicitation number W911S226U3039 for the procurement of a zero-turn lawn mower. This requirement is designated as an SBA Small Business Administration set-aside. The acquisition is classified under NAICS 333112 for Lawn and Garden Tractor and Home Lawn and Garden Equipment Manufacturing and PSC 2420 for Wheeled Tractors. Responses to this solicitation are due by April 23, 2026, and the primary point of contact for this requirement is Carrie Lawton.
The requested machine must be equipped with a minimum 27-horsepower, 2-cylinder gasoline engine featuring electronic fuel injection and a replaceable oil filter. Technical specifications include a 52-inch fabricated mowing deck with greaseable spindles, a hydrostatic transmission with a cooling fan, a hand-operated parking brake, and ROPS bar protection. The mower requires front and rear frame-mounted suspension with shock absorbers, a fuel capacity exceeding five gallons, and various operator amenities such as an adjustable suspension seat, a USB port, and an hour meter.
The contractor is responsible for delivering the unit fully assembled and operational to Fort Drum, New York, with a preferred delivery schedule of 120 days after the order is placed. The machine must include IUID labels along with all relevant operator, service, and parts manuals. One PDF attachment was included with the solicitation notice published on April 16, 2026.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.