Name | Type | Posted | Actions |
|---|---|---|---|
B08_Atch_7_-_Price_Schedule.xlsx | XLSX | Jun 10, 2026 | |
B08_Atch_6_-_Proposal_Submission_Cover_Page___ToC.docx | DOCX | Jun 10, 2026 | |
B08_Atch_5_-_Construction_Wage_Determination_5_18_26.pdf | Jun 10, 2026 | ||
B08_Atch_3_-_Product_Data.pdf | Jun 10, 2026 | ||
B08_Atch_2_-_Drawings.pdf | Jun 10, 2026 | ||
B08_Atch_1_-_Specifications.pdf | Jun 10, 2026 | ||
B08_Atch_15_-_Subcontracting_Percentage_Worksheet.xlsx | XLSX | Jun 10, 2026 | |
B08_Atch_14_-_General_References_Form.docx | DOCX | Jun 10, 2026 | |
B08_Atch_13_-_52_209-13_Response_Form.docx | DOCX | Jun 10, 2026 | |
B08_Atch_12_-_52_209-7_Response_Form.docx | DOCX | Jun 10, 2026 | |
B08_Atch_11_-_SF_24_Bid_Bond.pdf | Jun 10, 2026 | ||
B08_Atch_10_-_Key_Personnel___Trades_Form.docx | DOCX | Jun 10, 2026 | |
B08_Atch_8_-_Project_Experience_Questionnaire.docx | DOCX | Jun 10, 2026 | |
B08_Atch_9_-_Past_Performance_Questionnaire.docx | DOCX | Jun 10, 2026 | |
B08_Atch_4_-_Dellenbaugh_Transportation_Map.pdf | Jun 10, 2026 | ||
Sol_140P8126R0002.pdf | Jun 10, 2026 |
LAKE26-0039-PARA FIRE SUPRESSION SYSTEM
Contact and place of performance
Overbaugh, Caleb
Not specified
Construction project to bring two NPS log cabins, located at the Dellenbaugh Admin Site at Grand Canyon-Parashant National Monument, up to the current fire code. The contractor will install a new sprinkler and fire detection system in these two cabins. The work includes all plumbing and electrical work needed to install the new system.
The National Park Service has issued solicitation 140P8126R0002 for a construction project to bring two log cabins up to current fire code at the Dellenbaugh Admin Site within Grand Canyon-Parashant National Monument. The project requires the installation of a new sprinkler and fire detection system in both cabins, encompassing all necessary plumbing and electrical work. This requirement is classified under NAICS 238220 Plumbing, Heating, and Air-Conditioning Contractors and PSC Y1NZ CONSTRUCTION OF OTHER UTILITIES.
Responses to this solicitation are due by July 17, 2026. Caleb Overbaugh is the designated point of contact for the procurement. The solicitation includes 16 attachments providing technical details and submission instructions, including project specifications, drawings, product data, a construction wage determination, and a price schedule.