Name | Type | Posted | Actions |
|---|---|---|---|
697DCK-26-R-00208 - Amendment 5.pdf | May 31, 2026 | ||
697DCK-26-R-00208 - Amendment 4.pdf | May 14, 2026 | ||
697DCK-26-R-00208 - Amendment 3.pdf | May 7, 2026 | ||
697DCK-26-R-00208 - Amendment 2.pdf | Apr 20, 2026 | ||
697DCK-26-R-00208 - Amendment 1.pdf | Apr 6, 2026 | ||
Attachment 5 - wp-d-601-41812-t-a-6.pdf | Apr 6, 2026 | ||
Attachment 1 - SBP ATCT Roof Replacement SOW.V2.pdf | Apr 6, 2026 | ||
697DCK-26-R-00208 - FE.pdf | Apr 2, 2026 | ||
Attachment 1 - SBP ATCT Roof Replacement SOW.pdf | Apr 2, 2026 | ||
Attachment 2 - DB Act WD CA20260012 - San Luis Obispo County.txt | TXT | Apr 2, 2026 | |
Attachment 3 - Site Visit Registration Form.doc | DOC | Apr 2, 2026 | |
Attachment 4 - Past Performance Questionairre.pdf | Apr 2, 2026 |
San Luis Obispo (SBP) ATCT Roof Replacement
Contact and place of performance
Rodgers Cox
San Luis Obispo, CA 93401
USA
The Subcontractor shall furnish all labor, materials, equipment, supervision and all other services required to replace the roof at ATCT at SBP. Attached drawings are for reference only, Approximate quantities ATCT Cab roof 361 sq. ft. The scope of work includes but not limited to: • Remove and dispose of existing roofing system from the SBP ATCT cab roof. • Provide and install roof ha...
View moreThe Federal Aviation Administration, through the 697DCK Regional Acquisitions Svcs office, is soliciting for the replacement of the roof at the Air Traffic Control Tower in San Luis Obispo, California. This solicitation, identified as 00SBP, is designated as an SBA (SBA) set-aside. The project is classified under NAICS 238160 Roofing Contractors and PSC Y1BA Construction of Air Traffic Control Towers.
The scope of work requires the contractor to furnish all labor, materials, equipment, and supervision to replace approximately 361 square feet of the ATCT cab roof. Requirements include the removal and disposal of the existing roofing system, the installation of a roof hatch guardrail kit with a self-closing galvanized gate, and the replacement of all roof drains and the roof hatch. The contractor must also relocate the grounding counterpoise from the roof to the parapet wall and ensure the daily removal of debris in accordance with local and state regulations.
Responses to this solicitation are due by June 16, 2026. The procurement documentation includes 12 attachments, including five amendments and technical drawings. Rodgers Cox is the designated point of contact for this requirement.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.