Name | Type | Posted | Actions |
|---|---|---|---|
https://www.neco.navy.mil/biz_ops/search_edi.aspx | LINK | Jun 3, 2026 |
59--CHASSIS,ELECTRICAL-, IN REPAIR/MODIFICATION OF
Contact and place of performance
KRISTEN N. FLORCZAK, N723.09, PHONE (215)697-3770, EMAIL [email protected]
Not specified
NSN 7R-5975-015123483-V2, TDP VER 001, QTY 32 EA, DELIVERY FOB ORIGIN. Repair Turnaround Time (RTAT) definition: The contractual delivery requirement Is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commerci...
View moreThe NAVSUP Weapon Systems Support (NAVSUP WSS) office of the Department of the Navy has issued a pre-solicitation notice for the repair and modification of electrical chassis. This requirement, identified by solicitation number N0038326RAA43 and NSN 7R-5975-015123483-V2, involves a quantity of 32 units categorized under PSC 5975, Electrical Hardware and Supplies, and NAICS code 335931, Current-Carrying Wiring Device Manufacturing. The performance period includes a 365-day induction expiration date following the contract award, with deliveries made FOB Origin.
The government intends to negotiate with only one source under the authority of FAR 6.302-1, as this flight-critical part requires engineering source approval to maintain quality. The approved source retains unique design capability, engineering skills, and technical data not economically available to the government. Responsible sources may submit a proposal or capability statement for consideration; however, any alternate source must qualify according to the design control activity's procedures and submit required information from the NAVSUP WSS Source Approval Information Brochure.
The contractual repair turnaround time (RTAT) will be measured from the date of physical receipt at the contractor's facility as recorded in the Commercial Asset Visibility (CAV) system. Contractors are required to provide a monthly throughput constraint for the assets. Final inspection and acceptance by the government must be obtained within the established RTAT. The response deadline for this notice is July 20, 2026, though proposals received within 45 days of the June 3, 2026, publication date will be considered for the purpose of determining whether to conduct a competitive procurement.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.