Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Jun 8, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Jun 8, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Jun 8, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W911S226U3388¬iceType=CombinedSynopsisSolicitation | LINK | Jun 8, 2026 |
Wrapping Machines
Contact and place of performance
Ricardo LOPEZ-HERNANDEZ
00904
Procurement of Semi-Automatic Stretch Wrapping Machines1.0 Project Title and ScopeThis Statement of Work (SOW) defines the requirements for the purchase and delivery of three (3) semi-automatic stretch wrapping machines for use at Fort Buchanan, Puerto Rico 00934, Buildings 613 and 522. The contractor shall provide all labor, materials, equipment, and transportation necessary to deliver the machines to these location...
View moreThe Department of the Army, MICC-Fort Drum, has issued a combined synopsis and solicitation under solicitation number W911S226U3388 for the procurement of three semi-automatic stretch wrapping machines. This requirement is set aside for the Small Business Administration (SBA) and falls under NAICS 333993, Packaging Machinery Manufacturing, and PSC 3540, WRAPPING AND PACKAGING MACHINERY. The contractor is responsible for providing all labor, materials, equipment, and transportation to deliver the machines to Buildings 613 and 522 at Fort Buchanan, Puerto Rico. All equipment and major components must be manufactured in the United States or by affiliates in countries approved under the Trade Agreements Act.
The technical scope includes machines capable of wrapping loads up to 80 inches in height with a 4,000-pound capacity. Specifications require a programmable logic controller with a user-friendly interface, powered pre-stretch film carriages, and drive systems utilizing chain and sprocket or V-belts. The selected contractor must complete all work, including delivery and the provision of user manuals and maintenance documentation, within 90 calendar days of the contract award. A minimum one-year warranty on materials, equipment, and workmanship is required starting from the date of government acceptance. Responses to this solicitation are due by June 11, 2026.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.