Name | Type | Posted | Actions |
|---|---|---|---|
12FPC326B0010 IFB Combined Synopsis.pdf | Jun 15, 2026 | ||
Changes Attachment 1 -Construction Specifications.pdf | Jun 15, 2026 | ||
Changes Attachment 4 - OhleyHollowRd Drawings.pdf | Jun 15, 2026 | ||
QA Sharon Hollow Road and Ohley Hollow Road EWP.pdf | Jun 11, 2026 | ||
Attachment 3 - SharonHollowRd Drawings revised.pdf | Jun 11, 2026 | ||
12FPC326B0010 IFB Combined Synopsis.pdf | Jun 9, 2026 | ||
Original Sign-in-Sheet - Site Visit.pdf | Jun 5, 2026 | ||
Attachment 2 WD WV20260069 5-18-2026.pdf | May 21, 2026 | ||
12FPC326B0010 IFB Combined Synopsis.pdf | May 21, 2026 | ||
12FPC326B0010 IFB Combined Synopsis.pdf | May 18, 2026 | ||
Attachment 4 - OhleyHollowRd Drawings.pdf | May 18, 2026 | ||
Attachment 3 - SharonHollowRd Drawings.pdf | May 18, 2026 | ||
Attachment 2 WD WV20250073 1-2-2026.pdf | May 18, 2026 | ||
Attachment 1 -Construction Specifications.pdf | May 18, 2026 |
NRCS-WV Kanawha County EWP Streambank Stabilization Sharon Hollow and Ohley Hollow Road
The USDA Farm Production and Conservation Business Center is soliciting bids for streambank stabilization in Kanawha County, West Virginia, under the Emergency Watershed Protection program. Work is centered on Sharon Hollow Road and Ohley Hollow Road and includes channel shaping, erosion control, and water removal. This is an Invitation for Bid for a firm-fixed-price contract. Tasks involve clearing vegetation, excavation, and constructing earth embankments as detailed in the engineering drawings. Technical specifications require rock riprap and gabion walls, with a requirement for hand-lacing gabion baskets. At the Ohley Hollow site, the project includes decommissioning an abandoned septic tank if disturbed, installing temporary fencing, and avoiding a designated pet cemetery. This is a 100% small business set-aside under NAICS 237990. Bids are due June 24, 2026, with a 70-day performance period. Technical documentation includes revised specifications, site drawings, and a Q&A document. The USDA Natural Resources Conservation Service in West Virginia is seeking bids for the Kanawha County Emergency Watershed Protection project. Work involves streambank stabilization at Sharon Hollow Road and Ohley Hollow Road. The performance period is 70 calendar days from the Notice to Proceed. Work is limited to 10 hours per day, six days a week.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Mark Domingo
WV
USA
See changes to Ohley Hollow Rd. Drawings and to Specification document - updated 6/15/2026. Changes to the Ohley Hollow Road Drawings: Note showing the potential that an abandoned septic tank (unknown location) may be encountered and will need to be decommissioned if it is disturbed. Note showing the location of a pet cemetery and to avoid this location. Note showing a temporary fence must be constructed between the...
View moreMob Spec:
Please see attachments and comibined synopsis solicitaiton for further deatails.
Kanawha County EWP 5091-001 Streambank Stabilization Sharon Hollow and Ohley Hollow Road for USDA NRCS-WV.
The project consists of clearing designated areas by the removal and disposal of trees, logs, stumps, shrubs, brush, and rubbish and the shaping of the channel.
Installing measures or performing work to control erosion and minimize the production of sediment and
other pollutants to water and air from construction activities.
Preparing the area for treatment; furnishing and placing seed, sprigs, mulch, fertilizer, inoculant, lime, and
other soil amendments; and anchoring mulch in designated areas as specified.
The work consists of the mobilization and demobilization of the contractor’s forces and equipment
necessary for performing the work required under the contract.
Establishing traffic control and maintaining safe, convenient use of public roads and right of way.
Removal of surface water and ground water as necessary to perform the construction required by the
contract in accordance with the specifications. It must include: (1) constructing, installing, building, and
maintaining all necessary temporary water containment facilities, channels, and diversions; (2) furnishing,
installing, and operating all necessary pumps, piping, and other facilities and equipment; and (3)
removing all such temporary works and equipment after their intended function is no longer required.
Excavation required by the drawings and specifications, as well as the disposal of the excavated materials.
Construction of earth embankments, other earthfills, and earth backfills required by the drawings and
specifications.
*See Specifications document attached to posting for full details of required work.