Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Sep 10, 2025 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Sep 10, 2025 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Sep 10, 2025 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W911S225U1989¬iceType=CombinedSynopsisSolicitation | LINK | Sep 10, 2025 |
Physical Training Outdoor Shelter
Contact and place of performance
Alexander Cho
98433
Item:PT ShelterBrand Name:Part Number:Salient Characteristics:The PT shelter needs to provide at/or around 1,600 square feet or40x40ft of covered space for operational, training, or storage requirements. It needs to havea weatherproof frame and a UV-resistant, waterproof, and fire-retardant canopy, for use inadverse conditions. The shelter should be deployable in 2?3 hours by 4?6 personnelwithout heavy equipment and...
View moreThe Department of the Army, specifically the MICC-Fort Drum office, is seeking a physical training outdoor shelter under solicitation number W911S225U1989. This procurement is designated as a total small business set-aside (SBA) under NAICS code 321991, Manufactured Home (Mobile Home) Manufacturing, and PSC 5411, Rigid Wall Shelters. Alexander Cho is the designated point of contact for this requirement, which has a response deadline of September 18, 2025.
The required shelter must provide approximately 1,600 square feet of covered space, measuring 40 by 40 feet with a peak height of 14 to 16 feet, to support operational, training, or storage needs. The unit must feature a corrosion-resistant, weatherproof frame and a UV-resistant, waterproof, and fire-retardant canopy capable of withstanding sustained wind loads of 50 to 60 mph and moderate snow accumulation.
Designed for rapid deployment, the shelter must be setup by four to six personnel in two to three hours without the use of heavy equipment. The components must be modular and palletized for ease of transport via forklift, allowing for scalability by connecting multiple units to expand the total coverage area. This combined synopsis/solicitation was originally published on September 10, 2025, and contains no associated attachments.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.