Name | Type | Posted | Actions |
|---|---|---|---|
General Specifications-Cummins Inc. Generators.docx | DOCX | Apr 10, 2026 |
High Altitude Electromagnetic Pulse (HEMP) Hardened Generators
Contact and place of performance
Capt Kevin Sheedy
Multiple Base Locations
DEU
DISCLAIMER: Please note that this is NOT an Invitation for Bid (IFB) or a Request for Proposal (RFP) or Quote (RFQ). This Sources Sought is part of ongoing Government conducted market research for planning purposes. A solicitation is not being issued at this time and this notice shall not be construed as a commitment by the Government to issue a solicitation. The Government will not prov...
View moreThe current and projected requirement is for a flexible ordering mechanism to acquire these generators as needed across 42 OCONUS USAFE installations. Quantities are undetermined as this sources sought market research is for a potential future multiple year Blanket Purchase Agreement (BPA). These generators will support mission-critical Command, Control, Communications, Computers, and Intelligence (C4I) and Nuclear Command, Control, and Communications (NC3) system platforms across the USAFE theater of operations, ensuring their survivability in a post-HEMP environment.
The most critical performance requirement is that the generators must have documented, official proof of successfully passing HEMP survivability testing at the Horizontally Polarized Dipole (HPD) EMP Simulator at NAWCAD, Patuxent River, MD. This is a military-unique requirement layered upon a commercial product. The generators must be specific Cummins Rugged Mobile Power (RMP) models compliant with MIL-DTL-32496 and MIL-STD-461F. A critical long-lead schedule item is the generator delivery, which is anticipated to be 60-120 days after receipt of order. The contractor must also provide a complete documentation package, including Hardness Maintenance/Hardness Surveillance (HM/HS) procedures per NC3 Directive 501-02. Here is the list of requirements as stated above:
Questions regarding this sources sought are due to by Tuesday, 14 April 2026 at 2300 CEST (1700 EST).
We are kindly requesting any input on whether your agency has the capability of supplying and servicing these generator for our 42 OCONUS locations. In addition, if willing and able, please provide a rough order of magnitude (ROM) with your interest and capability.
The Department of the Air Force, specifically the 764 SCONS PK, has issued solicitation FA564126R0002 as a Sources Sought notice to identify potential contractors for the procurement of High Altitude Electromagnetic Pulse (HEMP) hardened generators. This market research supports a potential future multi-year Blanket Purchase Agreement for commercially available brand name or equal Cummins Inc. Rugged Mobile Power (RMP) generators in 5 kW, 10 kW, 15 kW, 30 kW, and 60 kW models. The acquisition is classified under NAICS code 423610 for Electrical Apparatus and Equipment, Wiring Supplies, and Related Equipment Merchant Wholesalers and PSC 6115 for Generators and Generator Sets, Electrical. No set-aside is currently designated for this requirement.
The primary purpose of these generators is to support mission-critical Command, Control, Communications, Computers, and Intelligence (C4I) and Nuclear Command, Control, and Communications (NC3) system platforms across 42 OCONUS USAFE installations. Units must ensure survivability in post-HEMP environments and must have official documentation of successful HEMP survivability testing at the Horizontally Polarized Dipole EMP Simulator at NAWCAD, Patuxent River, Maryland. Required models must comply with MIL-DTL-32496 and MIL-STD-461F. In addition to hardware delivery, the contractor is responsible for providing complete documentation packages, including Hardness Maintenance/Hardness Surveillance (HM/HS) procedures per NC3 Directive 501-02, and coordinating all logistics for testing and shipment to multiple locations in Germany.
Interested original equipment manufacturers or authorized resellers must submit capability statements and optional rough order of magnitude (ROM) pricing by April 17, 2026, with initial questions due by April 14, 2026. The performance period involves a critical long-lead schedule where generator delivery is anticipated between 60 and 120 days after receipt of order. One attachment, containing general specifications for Cummins Inc. generators, was provided with the notice on April 10, 2026. Capt Kevin Sheedy is the designated point of contact for this market research.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.