Name | Type | Posted | Actions |
|---|---|---|---|
AMENDMENT 0005.pdf | Jan 13, 2026 | ||
SOLICIATION W912DQ25RA004 0005 AMENDMENT.pdf | Jan 13, 2026 | ||
Solicitation Amendment W912DQ25RA004 0004 SF 30.pdf | Dec 3, 2025 | ||
Solicitation Amendment W912DQ25RA0040004 SF 30.pdf | Nov 25, 2025 | ||
Projnet Key Correction.pdf | Oct 23, 2025 | ||
Relevancy Factor Update.pdf | Oct 23, 2025 | ||
Off Site Spoils Site.pdf | Oct 23, 2025 | ||
F-001 - LIFE SAFETY CODE ANALYSIS..pdf | Oct 23, 2025 | ||
FLW AIT Barracks Trailer and Laydown Areas (1).pdf | Oct 23, 2025 | ||
B.07.01 Site Visit Sign In Sheet AIT Phase 2.pdf | Oct 3, 2025 | ||
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912DQ25RA004¬iceType=SolicitationNotice | LINK | Sep 16, 2025 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Sep 16, 2025 | |
https://dodprocurementtoolbox.com/ | LINK | Sep 16, 2025 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Sep 16, 2025 |
403873 FLW AIT Barracks Complex II Phase 2
Contact and place of performance
Dale Coleman
Fort Leonard Wood, MO 65473
USA
****Update Jan 12, 2025***** Amendments 0005 incorporates answers to the questions from ProjNet and updates the Construction Wage Rates. ****Update Nov 25, 2025**** Amendment 0004 removes the requirement for PLA and extends the due date to Jan 23, 2026 ****Update Nov 3, 2025**** Amendment 0003 extends the due date to Dec 4, 2025 while potential changes to the Div 00 specifications are developed ****Update Oct 28, 202...
View moreThe United States Army Corps of Engineers Kansas City District has a requirement for the construction of a standard design Advanced Individual Training (AIT) Battalion Complex at Fort Leonard Wood, Missouri. This project, identified under solicitation number W912DQ25RA004, supports 600 soldiers and is classified under NAICS 236220 Commercial and Institutional Building Construction and PSC Y1FC Construction of Troop Housing Facilities. The scope includes the delivery of standard design AIT Barracks and Company Operations Facilities for two companies, two lawn equipment buildings, and two physical training stations.
Construction requirements involve building tornado and storm protection measures, fire detection and sprinkler suppression systems, and antiterrorism/force protection measures. Technical installations include information systems, intrusion detection and alarm systems, and an integrated energy monitoring and control system designed to connect with base monitoring systems. Recent administrative updates have incorporated answers to bidder inquiries, updated construction wage rates, and removed the requirement for a Project Labor Agreement.
The response deadline for this solicitation is January 23, 2026, with Dale Coleman serving as the point of contact. The administrative record contains 10 attachments, including Amendment 0005, relevancy factor updates, and ProjNet key corrections. Drawings for the project are hosted within the ProjNet file system.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.