Name | Type | Posted | Actions |
|---|---|---|---|
36C26126R0042 0001.docx | DOCX | Jun 15, 2026 | |
Pre Proposal Site Visit Flyer 36C26126R0042 Amend 01.docx | DOCX | Jun 15, 2026 | |
Attachment Specifications 570-26-228.pdf | Jun 10, 2026 | ||
Attachment Exhibit A Drawing FR-BLDG_01-BASEMENT HOURS.pdf | Jun 10, 2026 | ||
Attachment Exhibit B Basement Floor Drawing.pdf | Jun 10, 2026 | ||
Attachment PCRA - NSF Ceiling Replacement.pdf | Jun 10, 2026 | ||
36C26126R0042_2.docx | DOCX | Jun 10, 2026 | |
Attachment Requests for Information RFI_ Form.docx | DOCX | Jun 10, 2026 | |
Attachment WD CA20260018 05.18.26.pdf | Jun 10, 2026 | ||
Pre Proposal Site Visit Flyer 36C26126R0042.docx | DOCX | Jun 10, 2026 | |
Price Breakdown Worksheet 36C26126R0042.docx | DOCX | Jun 10, 2026 | |
Attachment Price Breakdown 570-26-228.xlsx | XLSX | Jun 10, 2026 |
Z2DA--Replacement of Ceiling Kitchen Area, Building 1, Basement Project #570-26-228 Fresno, CA
This firm-fixed-price construction project involves replacing approximately 4,000 square feet of kitchen area ceiling in the basement of Building 1 at the VA Central California Health Care System in Fresno, CA. The work includes demolition and the installation of new acoustical and linear metal ceilings within a 45-day performance period. The requirement is a total set-aside for verified Service-Disabled Veteran-Owned Small Businesses (SDVOSB). Amendment 0001 extended the proposal deadline to July 13, 2026, and the RFI deadline to June 25, 2026, while adding a second pre-proposal site visit on June 18, 2026. Award will be made to the lowest price responsive offeror meeting all technical and administrative criteria, including mandatory SDVOSB certification. Technical requirements include adherence to master specifications, safety protocols, and a Pre-Construction Risk Assessment (PCRA) that covers site-specific safety plans and infection control. The solicitation includes technical specifications, floor plans, and administrative requirements for the Building 1 basement kitchen. Amendment 0001 updated the site visit schedule and extended the RFI and proposal deadlines. Exhibits A and B provide layout details and square footage for the kitchen and surrounding infrastructure. The project requires replacing the kitchen ceiling in the Building 1 basement at the VA Central California Health Care System. Work involves demolishing existing grids and tiles and installing new components across roughly 4,000 square feet of space. The contractor provides all labor, materials, and equipment.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Yuliya V Kochkina
Not specified
AMENDMENT-DESCRIPTION The purpose of this amendment is to provide the information mentioned below: Correct the incorrectly posted time for pre-proposal site visit conducted on Monday, June 15, 2026. Add 2nd pre-proposal site visit Extend due date to submit RFIs Extend proposal due date All other terms and conditions remain unchanged and are in full force and effect. (END OF AMENDMENT-DESCRIPTION)